We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Pre-cutting System.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Pre-cutting System - List of Manufacturers, Suppliers, Companies and Products

Pre-cutting System Product List

1~2 item / All 2 items

Displayed results

Pre-cut system

Fully compatible with timber construction for a stock-type society! Achieving quality improvement and cost reduction!

Yamada Corporation's "Precut System" processes everything from material supply and structural timber to plywood in a consistent manner. Centered around the regional brand material "Miyagi's Date Cedar," we can supply all components using local materials. We provide high-precision wood products that can be used with confidence. 【Features】 ■ High-speed processing with precision of 0.1mm ■ Achieves quality improvement and cost reduction ■ Shortens construction time ■ Solves the shortage of skilled workers ■ Increases the strength of joints to about 1.5 times compared to manual processing *For more details, please refer to the PDF document or feel free to contact us.

  • wood

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pre-cut system

Wood processing by advanced computers! A revolutionary factory production system for wooden houses.

The "Precut System" is a system that has transitioned the processing of housing materials such as columns and beams, which has traditionally been done manually, to computer-controlled processing. With the advanced precut machine introduced by our company, the customer’s requested drawings are first input into CAD, which automatically generates processing data for structural materials. This data is then directly transferred to the automatic processing machine for the fabrication of the materials. As a result, we have successfully achieved the prevention of processing errors, as well as labor and time savings. 【Flow of Precut Material Delivery】 ■ 25 days before delivery: Obtain specifications, floor plan, and elevation drawings (foundation drawings) ■ 20 days before delivery: CAD input ■ Changes discussed ■ 10 days before delivery: After approval, prepare documents ■ 4 to 5 days before delivery: Processing ■ Delivery *For more details, please download the PDF or feel free to contact us.

  • Wood processing machinery

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Related Categories of Pre-cutting System